Batakis led the opening of bids for its construction

Batakis led the opening of bids for its construction

Batakis, stated that “expanding our energy capacity is essential to release the country’s productive activity, and we are working on this with all sectors.”

Then the secretary Dario Martinez stated that “this work will position Argentina on a path of greater energy security, with the possibility of having gas activity in all provinces, substituting imports and saving foreign exchange, but also ensuring that many industrial parks have the possibility of have gas, that many Argentine men and women in each of our provinces have gas at a competitive price.”

For his part, the President of Argentine Energy, Agustin Gerezstressed that the gas pipeline “is the great work of transformation for the future of our country because it will allow us to access more energy at competitive values, promoting production and work, as well as the substitution of gas imports and export to the region and the world.

In this instance, theopening of envelope one with the background of the different bidderswhich will be analyzed for later, among those who meet the requirements established in the specifications, to proceed to the opening of envelope 2 with the economic offer.

The President Néstor Kirchner gas pipelinewhich is part of the Transport.Ar Programwill have an extension of 573 kilometers between the Neuquén town of Treaten Y Salliqueloin the west of the province of Buenos Aires, crossing Rio Negro and La Pampa. The project also includes complementary works such as the Mercedes-Cardales gas pipeline and the NEUBA II gas pipeline loop, thus totaling 680 kilometers of pipes in Stage I.

It should be noted that on June 16 the contract was signed with the company SIAT for the provision of pipes of 36 and 30 inches.

The Presidente Néstor Kirchner Gas Pipeline will expand the capacity of the Argentine natural gas transportation system by 25%. It will also be essential for the development of production in Dead cowsince it will allow this input to reach the country’s large consumption centers, fully improving the performance of the gas transportation system.

The event included the participation, also virtual, of the Secretary of Energy, Darío Martínezwhile they did it in person on Undersecretary of Electric Power, Federico Basualdothe President of Energía Argentina, Agustín Gerez, and the Deputy General Manager, Gastón Leydet.

The directors of Energía Argentina were also present. Oscar Cretini, Maria Belen de los Santos, Victor Bronstein, Mariano Barrera Y Mario Metaza.

Source: Ambito

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest Posts