Image: ÖBB
The employees are offered a job in the Bruck/Mur, Leoben, Kindberg or Kapfenberg plants. Alternatively, there is the option of using the steel foundation voestalpine to enter in order to reorientate oneself or to further educate oneself. In addition, a social plan is being developed with the employee representatives.
The voestalpine Wire Rod Austria GmbH, which is part of the Metal Engineering Division voestalpine AG, will partially relocate its production from Fürstenfeld in Eastern Styria to Bruck/Mur in Upper Styria by March 2024. It was said on Friday that continuing the production of saw wires for the European photovoltaic industry was no longer economically viable. Comprehensive restructuring measures and investments have been carried out over several years. However, the saw wires manufactured in Fürstenfeld for the photovoltaic industry are no longer internationally competitive, it said voestalpine with.
Production must therefore be stopped by the end of 2023. The production of special wire products (reed contacts) for the electronics industry will be carried out at the Bruck/Mur location voestalpine Wire Austria GmbH relocated.
My themes
For your saved topics were
new articles found.

info By clicking on the icon you can add the keyword to your topics.
info
By clicking on the icon you open your “my topics” page. They have of 15 keywords saved and would have to remove keywords.
info By clicking on the icon you can remove the keyword from your topics.
Add the topic to your topics.
Source: Nachrichten