Image: Market town
The core of the project was the construction of a one and a half meter wide sidewalk connection for the residents of the Kirchenberg from the cemetery to the church. In addition, the bottleneck around the old “Pfarrerstadl” was defused. In addition to the road construction measures, the entire underground infrastructure including sewers, gas and water pipes as well as power and internet cables was re-laid. Last but not least, the parking situation for the directly adjacent parish hall could be improved.
My themes
For your saved topics were
new articles found.

info By clicking on the icon you can add the keyword to your topics.
info
By clicking on the icon you open your “my topics” page. They have of 15 keywords saved and would have to remove keywords.
info By clicking on the icon you can remove the keyword from your topics.
Add the topic to your topics.
Source: Nachrichten