Image: Magistrate
The torrent and avalanche control department has built a new rockfall protection network in Unterhimmel. West of the site of the devastating rockfall last February, the first part of the “Undersky Protection Project” was completed.
- From the archive: Tragedy in Steyr: rock fall claimed two lives
- More on the subject: “We have lost our lifelong dream”: House will probably be demolished after rock fall
- Also read: “I wouldn’t want to live there anymore”
In total, the experts installed 120 linear meters of protective net with an energy absorption of 1,500 kilojoules: This means that the net can hold a block of stone with a volume of 2.5 cubic meters and a weight of 6.25 tons at a speed of 80 km/h.
After replacing the properties at Rosenegger Straße 4 and 7, the follow-up project can now be completed. It is expected that in the first half of 2024, the detached houses and the rock fall area will be demolished, a protective wall will be built, the crack in the rock will be grouted and another protective fence will be erected in the eastern area.
From the archive: Pictures show the fatal rock fall
My themes
For your saved topics were
new articles found.

info By clicking on the icon you can add the keyword to your topics.
info
By clicking on the icon you open your “my topics” page. They have of 15 keywords saved and would have to remove keywords.
info By clicking on the icon you can remove the keyword from your topics.
Add the topic to your topics.
Source: Nachrichten