At both stations, a comprehensive renovation will be carried out consisting of waterproofing work, painting, floor repair, new LED lights, signage renewal and placement of braille signage on handrails and porches; new furniture on the platform, such as benches, baskets and ischial supports.
Added to that, In Lima, the replacement of historical pieces will be carried out to preserve the station’s heritage.
The project will include the intervention of the sectors corresponding to accesses, staircase galleries (pedestrian and mechanical), lobbies and platforms, and aims to guarantee better circulation through the station, transform it into a more comfortable, orderly space with greater lighting.
As these are combination stations, passengers will be able to request a combination ticket at the ticket offices of the surrounding stations.
WhatsApp Image 2025-01-06 at 15.50.58.jpeg
The Pueyrredón station combines with Line H.
In the case of Pueyrredón, which connects with Line H, tickets can be requested at Carlos Gardel and Pasteur-AMIA of Line B and Currents of Line H.
On the Lima side, you can request it at Saenz Pena and stones from Line A or May Avenue of Line C.
WhatsApp Image 2025-01-06 at 15.50.58 (1).jpeg

Lima station combines with Line C.
The Comprehensive Station Renewal Plan
As part of the Comprehensive Station Renewal Plan, they are also closed for works Palermo and Scalabrini Ortiz, while they put themselves in value Castro Barros and Acoyte (Line A), Saint Martin (Line C), Bulnes and Faculty of Medicine (Line D), Jujuy (Line E) and Pasteur-AMIA (Line B), and nine inns Premeter (Ana Díaz, Escalada, Presidente Illia, City Park, Pola, Lugano Civic Center, Our Lady of Fátima, Mayor Saguier and Somellera).
At the same time, the work of Obelisk Central (Lines C, B and D), to improve accessibility and circulation, is in the last stage.
Finally, work will begin nearby at the stations Uruguay, Carlos Gardel and Malabia (Line B); Agüero, Courts and Italy Square (Line D); and Loria, Rio de Janeiro, Stones and Congress (Line A). In the Premetro, work began in the Mariano Acosta, Cecilia Grierson, Fernández de la Cruz and Ana María Janer inns, and will continue in Larrazabal, Nicolás Descalzi and Gabino Ezeiza.
Source: Ambito

I am Pierce Boyd, a driven and ambitious professional working in the news industry. I have been writing for 24 Hours Worlds for over five years, specializing in sports section coverage. During my tenure at the publication, I have built an impressive portfolio of articles that has earned me a reputation as an experienced journalist and content creator.