They found another body and there are now three fatalities

They found another body and there are now three fatalities

The authorities confirmed the discovery of another lifeless body, still unidentified, among the remains of the collapse that occurred last Tuesday in Villa Gesell and the number of fatal victims of the tragedy amounts to three people, including Federico César Ciocchini and María Rosa Stefanic, the former owner of the hotel. Rescuers are working in the area in search of six missing people.

The Dubrovnik hotel, 10 floorswas located on Buenos Aires and Calle 1 streets, Villa Gesell, and was undergoing renovation work despite the intimation from the municipality that demanded the stoppage of the works. At the moment, the prosecutor Veronica Zamboni continues with the investigations of the first arrested for the collapse.

Villa Gesell collapse: another fatal victim was found in the rubble

Villa Gesell has been in turmoil for hours since the Dubrovnik hotel collapsed last Tuesday. More than 3 days after the incident occurred, a intense operation in the search for survivorswith the work of more than 650 rescuers from all over the country.

Landslide in Villa Gesell 4.jpg

More than 650 rescuers are working in the area of ​​the collapse.

Municipality of Villa Gesell

This Saturday morning, rescue team personnel confirmed the discovery of a third corpse in the middle of the rubble. As detailed, it is a young man who has not yet been identified and, at the moment, they are working to get it out of the collapse area.

In this way, the new victim joins the list of people who died after the tragic collapse. Previously, they had been identified Federico César Ciocchinian 84-year-old retiree, already Maria Rosa Stefanicthe former owner of the hotel.

Work continues against the clock as authorities search for at least six other missing people. The rescue personnel include security personnel, firefighters from the Buenos Aires Police, a K9 brigade with rescue dogs, drones, a helicopter and advanced medical care units.

The audio that anticipated the collapse in Villa Gesell: “They are putting money, but it is a ball”

While firefighters and police continue to search for at least six people in the rubble, the audio of one of them went viral. This is one of the carpenters who is missing after more than 72 hours of searching.

In the voice message, the carpenter identified as Fabián expresses that “They are investing a lot of money in something that has become a ball. It’s like wanting to tune up Ali’s truck.“.

Embed – THE KEY AUDIO for the INVESTIGATION in the VILLA GESELL COLLAPSE: “EVERYTHING IS DONE PERCHA”

“The idea is that they take out all the ice cream cones, make them money, sell them and that it is no longer an apart hotel,” he adds, expanding on the warning published by the C5N news channel.

Finally, the carpenter concluded: “I’m going to do it sixth floor to first floormore or less condition it, and next year, or when the following season ends, We replaced everything with Melamine and without doors. This idea did not convince the architect, but it is what it is.”

What the municipality of Villa Gesell says

The municipality of Villa Gesell, through the Management of Private Buildings and Public Spacesdetected and stopped work that was being carried out inside the property for not having the proper authorization. The warning had been issued on August 20.

After the summons, the owners requested authorization for only the following tasks through a construction notice: change of carpentry, changes of floor coverings, interior painting, change of bathroom coverings and removal of countertops. These works are authorized by the Works Department with the exception that the change of carpentry was only authorized on the ground floor, and not on the upper floor.

After this, the building owners added a technical report about some preparatory tasks for an elevator that they intended to install in the reception area (next to the public road, which is not part of the current collapsed structure), as well as the request for authorization for the construction of a passageway partition for this intended elevator.

In another file, they also requested pre-feasibility for the installation of said elevator, an act that the Municipality resolves by letting them know on October 15 of this month of the need to formally present the documentation corresponding to this elevator work. At this time, although it is not possible to speak exactly about the details of the collapse, it can be stated that in the collapsed part (the rear part) the structure had been modified illegally and irregularly, without due authorization from the municipality. .

After what happened, the mayor of Villa Gesell, Gustavo Barreradeclared three days of mourning and expressed his condolences to the families affected by the incident. “As of today and for a period of three days, declares municipal mourning in the Villa Gesell District on the occasion of the tragic collapse that occurred in the Dubrovnik hotel“, indicated the municipal decree. In addition, during these days the National Flag will be flown at half-mast.

Source: Ambito

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest Posts