Bretstein-Lachtal (Murtal and Murau districts), Klementkogel (Voitsberg and Wolfsberg districts) and Wildbachgraben (Deutschlandsberg district). In the three areas, it is now being analyzed where lithium mining is worthwhile. In Wolfsberg itself, dismantling cannot begin until 2025 at the earliest. There, a total of 129,000 tons of battery-grade lithium hydroxide monohydrate are slumbering in the ground. The expected after-tax NPV is $1.5 billion.
Source: Nachrichten